SHIP REPAIR PROCESS
From MarineWiki
Contents |
Hull Structure
Machinery
Stern tube
In drydock, for normal sealing system, the wear down gauge reading or poker gauge reading is taken. This is also the Stern tube wear down inspection.
Propeller
The propeller is also cleaned of barnacles, usually by high pressure washing. If there is suspect of damage, then dye penetration test is done. If damage is found (either cavitation or other reason), then the propeller needs to be repaired by either weld repair or applying belezona tape.
In case of the weld repair, first the propeller has to be cleaned and grinding done. Then the bronze welding is done. After that, propeller grinding is done to make the surface smooth. Next the dye penetration test is done to verify.
Hull Piping
Hull Outfitting
Some of the standard inspections for the hull outfitting include
Anchor chain calibration